Analisis Failure Time Menggunakan Data GPS Geodetic dengan Metode Inverse Velocity pada Lereng Disposal HW 123 South Tutupan PT. Adaro Indonesia, Kalimantan Selatan
Abstract
Keywords
Full Text:
PDFReferences
Amitrano, D., & Helmstetter, A. (2006). Brittle creep, damage, and time to failure in rocks. Journal of Geophysical Research: Solid Earth, 111(11), 1–17. https://doi.org/10.1029/2005JB004252
Broadbent C.D., dan Zavodni, Z.M. (1982). Influence of Rock Structures on Stability in Stability in Surface Mining, Society of Mining Engineers, Denver, Co. Vol. 3 Ch. 2.
Fukuzono. (1985). A New Method for Predicting the Failure Time of a Slope. 145–150.
Gultom, J., Sannang, M. A., & Musa, R. H. (2014). Prediksi Waktu Longsoran Di Lereng Highwall Tambang Batubara Terbuka Dengan Metode Inverse Velocity.
Munthaha, Z. I., Yogiristanto, K., & Tronics, A. (2022). Penentuan Kondisi Kestabilan Timbunan Pit Menggunakan Prisma Berdasarkan Nilai Ambang Batas Laju Pergerakan Relatif Hasil Uji Balik. 155–164.
Steven, Sari, F. A., Anggraeni, W., & Nasrullah, M. I. (2020). Manajemen Risiko Kegagalan Lereng Pada Tambang Emas Menggunakan Teknologi Slope Stability Radar. Prosiding Tpt Xxix Perhapi, Geoteknik, 85–94.
Sullivan, T 2007, Hydromechanical Coupling and Pit Slope Movements, in Y Potvin (ed.), Proceedings of the 2007 International Symposium on Rock Slope Stability in Open Pit Mining and Civil Engineering, Australian Centre for Geomechanics, Perth, 3–43.
DOI: https://doi.org/10.31764/jpl.v5i2.28259
Refbacks
- There are currently no refbacks.
Copyright (c) 2025 JURNAL PERTAMBANGAN DAN LINGKUNGAN
Jurnal Pertambangan dan Lingkungan is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.