Penerapan Metode CPM dan PERT pada Sistem Informasi Manajemen Proyek Pembuatan Website Akreditasi dan Mutu Fakultas Sains dan Teknologi UIN Imam Bonjol Padang

Yaslinda Lizar, Ummi Rosmita

Abstract


Abstract: The Faculty of Science and Technology of UIN Imam Bonjol Padang is preparing for institutional and study program accreditation. One of the requirements is the provision of a complete accreditation and quality website. To ensure timely completion, the website project needs careful planning. This research applies the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) to management information systems for planning and scheduling accreditation website projects. CPM is used to determine the set of critical project activities while PERT calculates the probabilistic project duration. The application results show that the information system is able to help the accreditation website project management to be completed according to the deadline. In addition to planning and scheduling features, the system is equipped with a module for monitoring and evaluating project achievements. By applying CPM and PERT to the project management information system, project planning and control become more directed and reliable.

Abstrak: Fakultas Sains dan Teknologi UIN Imam Bonjol Padang tengah mempersiapkan akreditasi institusi dan program studi. Salah satu persyaratan adalah penyediaan website akreditasi dan mutu yang lengkap. Untuk memastikan pengerjaan tepat waktu, proyek website perlu perencanaan yang matang. Penelitian ini menerapkan metode Critical Path Method (CPM) dan Program Evaluation and Review Technique (PERT) pada sistem informasi manajemen untuk perencanaan dan penjadwalan proyek website akreditasi. CPM digunakan menentukan rangkaian aktivitas kritis proyek sedangkan PERT melakukan perhitungan durasi proyek probabilistik. Hasil penerapan menunjukkan sistem informasi mampu membantu manajemen proyek website akreditasi agar selesai sesuai tenggat waktu. Selain fitur perencanaan dan penjadwalan, sistem dilengkapi modul monitoring dan evaluasi capaian proyek. Dengan menerapkan CPM dan PERT pada sistem informasi manajemen proyek, perencanaan dan pengendalian proyek menjadi lebih terarah dan terpercaya.


Keywords


CPM; PERT; Fakuktas; Proyek4

Full Text:

PDF

References


Abdurrasyid, Abdurrasyid, Luqman Luqman, Abdul Haris, and Indrianto Indrianto. 2019. “Implementasi Metode PERT Dan CPM Pada Sistem Informasi Manajemen Proyek Pembangunan Kapal.” Khazanah Informatika : Jurnal Ilmu Komputer dan Informatika 5(1): 28–36.

Aguayo Torrez, Madahi Veronica. 2021. “No 主観的健康感を中心とした在宅高齢者における 健康関連指標に関する共分散構造分析Title.”

Amu, Timothy E J, Jermias Tjakra, and Pingkan A K Prastasis. 2023. “Penerapan Metode PERT Dan CPM Dalam Pembangunan Christian Center.” Tekno 21(83): 409–19.

Arianie, Ganesstri Padma, and Nia Budi Puspitasari. 2017. “PERENCANAAN MANAJEMEN PROYEK DALAM MENINGKATKAN EFISIENSI DAN EFEKTIFITAS SUMBER DAYA PERUSAHAAN (Studi Kasus : Qiscus Pte Ltd).” J@ti Undip : Jurnal Teknik Industri 12(3): 189.

Bloom, Nicholas, and John Van Reenen. 2013. NBER Working Papers 済無No Title No Title No Title. http://www.nber.org/papers/w16019.

Driyani, Dewi et al. 2021. “Jalur Kritis Pada Manajemen Proyek Untuk Aplikasi Website Sekolah.” 9(2): 111–22.

Lamjaya, Putra, and Florida Butarbutar. 2022. “OPTIMALISASI PROYEK INSTALASI GAS MEDIS DENGAN MENGGUNAKAN CRITICAL PATH METHOD ( CPM ) DAN PROGRAM EVALUATION AND REVIEW TECHNIQUE ( PERT ) DI RSIA ASIH JAKARTA SELATAN Instalasi Gas Medis Adalah Salah Satu Kebutuhan Yang Paling Penting Pada Rumah Sakit .” 25(2): 41–49.

Nisa, Khairrun. 2021. “The Role of Information Systems in a Web-Based Project Management.” : 1–14.

Pangestu, Nia Fitriyah, Ara Fathia Az Zahra, and Sutrisno Sutrisno. 2021. “Penerapan Metode Critical Parth Method (CPM) Dalam Proyek Pembangunan Jembatan Alun-Alun Kota Kuningan.” Journal of Industrial and Manufacture Engineering 5(2): 100–106.

Rahmah Muthia, 2018. 2018. “No 主観的健康感を中心とした在宅高齢者における 健康関連指標に関する共分散構造分析Title.” 2(3): 1–26.

Saputri, N K T. 2022. “Penerapan Manajemen Proyek Dengan Metode CPM (Critical Path Method) Dan PERT (Project Evaluation And Review Technique) Pada Proyek ….” journal of Engineering, Technology & Applied Science 4(1): 23–32. https://repository.ubt.ac.id/repository/UBT28-06-2022-114022.pdf.

Siregar, Adde Currie, and Iffiginia Iffiginia. 2019. “Penggunaan Critical Path Method (CPM) Untuk Evaluasi Waktu Dan Biaya Pelaksanaan Proyek.” Teknika: Jurnal Sains dan Teknologi 15(2): 102.

Wijaya, Muchammad Sandy, Elly Ismiyah, and Akhmad Wasiur Rizqi. 2022. “Penjadwalan Proyek Instalasi Castable In Rotary Kiln Dengan Metode Critical Path Method ( CPM ).” Jurnal Sains, Teknologi dan Industri SITEKIN 19(2): 407–13. https://ejournal.uin-suska.ac.id/index.php/sitekin/article/view/17826/7807.

Yasmin Diya, Farah. 2022. “Rancang Bangun Sistem Informasi Manajemen Proyek Menggunakan Critical Path Method Dan What If Analysis Berbasis Web (Studi Kasus: PT. Triprima Karya).” Repository.Uinjkt.Ac.Id.

Yuwono, Wiji, M. Elfan Kaukab, and Yusqi Mahfud. 2021. “Kajian Metode PERT-CPM Dan Pemanfaatannya Dalam Manajemen Waktu Dan Biaya Pelaksanaan Proyek.” Journal of Economic, Management, Accounting and Technology 4(2): 192–214.




DOI: https://doi.org/10.31764/justek.v7i1.21455

Refbacks

  • There are currently no refbacks.


JUSTEK Official: