Analysis of Heavy Equipment Productivity in the Jalan Rel Kota Langsa Reconstruction Project
Abstract
The quality of the road produced during the reconstruction of Jalan Rel Kota Langsa is directly dependent on the materials used, the operators, and the application of heavy equipment. Errors in heavy equipment selection will lead to low productivity. This study aims to determine the productivity levels and the required duration for each piece of equipment to complete the Langsa City Road Reconstruction project. This research employs the Bina Marga method with a quantitative approach. The analysis results show that the productivity of heavy equipment for Aggregate Base Class A (LPA) work is as follows: dump trucks = 386.352 m³/day, motor graders = 617.143 m³/day, vibrator compactor rollers = 804.270 m³/day, and water tanks = 498 m³/day. For prime coat work: air compressors = 3486 m²/day and asphalt distributors = 647.089 liters/day. For Asphalt Concrete-Binder Course (AC-BC) work: dump trucks = 172.148 m³/day, asphalt finishers = 804.270 tons/day, tandem rollers = 401.017 m³/day, and pneumatic tire rollers = 365.776 m³/day. The duration required for heavy equipment execution is 2 days for LPA work, 1 day for prime coat work, and 2 days for AC-BC work.
Keywords
Full Text:
PDFReferences
Amin, C., & Khotibul umam, A. (2022). Analysis of Heavy Equipment Utilization in Excavation and Embankment Works (Case Study: Semarang–Demak Toll Road Construction Project Package 2, STA 10+394–26+704). Jurnal Konstruksi Dan Infrastruktur UGJ Cirebon, X, 87–94.
Fihani, A., Hasyim, H., & Karyawab, I. D. M. A. (2021). Analysis of Heavy Equipment Requirements and Costs for Surface Layer Compaction Work of the Mandalika Street-Race Circuit. Rekonstruksi Tadulako: Civil Engineering Journal on Research and Development. https://doi.org/10.22487/renstra.v2i1.223
Ismuhadi, A. (2020). Monitoring the Effectiveness of Water Trucks in Road Watering Operations at PT Amman Mineral Nusa Tenggara. Jurnal Pertambangan Dan Lingkungan, 1(1), 20–24.
Jaya, W., & Sutandi, A. (2019). Analysis of Heavy Equipment Productivity of Auger Drilling Machines, Crawler Cranes, and Excavators in Projects A and B. JMTS: Jurnal Mitra Teknik Sipil, 11–18.
Kengke, N. H., Baharuddin, B., & Kadir, H. A. (2019). Analysis of the Effectiveness of Heavy Equipment Utilization at the Provincial Office of Highways and Spatial Planning of Central Sulawesi. Jurnal Kolaboratif Sains, 2(1).
Nugraha, D., Iriana, R. T., & Djuniati, S. (2018). Analysis of Costs and Productivity of Heavy Equipment Usage in the Construction of the Siak IV Access Road, Pekanbaru. Jurnal Jom Fteknik, 5(1), 1–10.
PUPR, K. (2011). PUPR, K. (2011). Procedures for Road Maintenance and Inspection Minister of Public Works Regulation No. 13/PRT/M/2011 on Road Maintenance and Inspection Procedures 1–28.
PUPR, K. (2023). Regulation of the Minister of Public Works and Housing No. 1 of 2022 on Guidelines for the Preparation of Construction Cost Estimates in the Public Works and Housing Sector, 1–18.
Purnomo, A. S. (2021). Operating Procedures for Tandem Roller MGD-3 Heavy Equipment at the Public Works, Highways, and Water Resources Office of Jember Regency.
Purwanto, T., Wiranto, P., & Lukman H. (16 C.E.). Heavy Equipment Productivity in the Construction of the Larat–Lamdesar Road Section, Maluku Province. Jurnal Online Mahasiswa (JOM) Bidang Teknik Sipil, 1(1), 1–13.
Ramdhani, M. I., & Johari, G. J. (2021). Analysis of Heavy Equipment Productivity in Relation to Cost and Time in the Construction of the New Cipanas Ring Road, Garut Regency. Journal Konstruksi, 18(2), 62–71. https://doi.org/10.33364/konstruksi/v.18-2.810
RaynontoM.Y, Isdyanto, A., Rustam, M. S. P. A., Chyntia, J., Syahrir, M., Fauzi, M., & Welem, H. (2023). Heavy Equipment Productivity Planning for Beginners. Tohar Media.
Retno, D. P. (2013). Analysis of Optimization of Heavy Equipment Utilization in Road Construction Activities in Region III, Perhentian Raja and Kampar Kiri Hilir Districts, Kampar Regency. Jurnal Saintis, 13(2), 56–70.
Rostiyanti. (2008). Heavy Equipment for Construction Projects (2nd ed.). PT Rineka Cipta.
Rumbyarso, Y. P. A. (2023). Calculation of Heavy Equipment Productivity in the Semarang–Demak Toll Road Project Section 1C, Km 35+400 to 36+400. Mechonversio: Mechanical Engineering Journal, 6(2), 34–39.
Setiawati, D. N., & Meddeppunge, A. (2013). Analysis of Heavy Equipment Productivity in the Krakatau Posco Plant Construction Project Zone IV in Cilegon. Konstruksia, 4(2).
Sokop, R. M., Arsjad, T. T., & Malingkas, G. (2018). Sokop, R. M., Arsjad, T. T., & Malingkas, G. (2018). Analysis of Productivity Calculation of Excavation-Loading Equipment (Excavator) and Hauling Equipment (Dump Truck) in Land Development Works of Jordan Sea Residence Housing. Tekno, 16(70). Tekno, 16(70).
Suryawan, K. A. (2020). Heavy Equipment Management. Deepublish.
Umum, S. E. M. P. (2010). Ministry of Public Works. Direktorat Jenderal Bina Marga,“Spesifikasi Umum Perkerasan Aspal Revisi, 3.
Wilopo, D. (2009). Construction Methods and Heavy Equipment. In UI-PRESS.
DOI: https://doi.org/10.31764/justek.v8i4.35015
Refbacks
- There are currently no refbacks.
JUSTEK : Jurnal Sains dan Teknologi sudah terindeks
EDITORIAL OFFICE: